Office Piano House
Szymanowskiego 12, Wrzeszcz, Gdansk
5/5 (1 rating)
About Piano House office
Piano House is a modern class A office building located in the western part of the city. It is distinguished by its unusual and representative architecture. It has 5 floors above ground and almost 5,400 sqm of total space, of which offices occupy 4,300 sqm. The area of a typical floor is 1,163 sqm, and the minimum module for rent is 190 sqm. The office building offers attractive office space and retail and service units on the first floor. The high standard of finishes, the use of environmentally friendly solutions, the possibility of flexible space arrangement, as well as significant glazing and optimal access to daylight, ensure comfortable working conditions. Tenants have at their disposal 100 parking spaces in the underground garage. Piano House is located on the border of Wrzeszcz and Strzyża districts, in the vicinity of apartment buildings and single-family developments. In the vicinity is the main thoroughfare of the Tricity and the Baltic Gallery, a little further - the University of Gdansk. The location allows you to take full advantage of the city's retail, service, catering, cultural and hotel offer. The location allows efficient movement, both by public and private transport. Nearby bus and streetcar stops and railroad stations Gdansk Wrzeszcz and Gdansk Zaspa. Access by car to the main railroad station takes about 10 minutes, to the Gdansk Airport - about 15 minutes.
Piano House property features
- Access control
- Air conditioning
- Carpeting
- Computer cabling
- Fibre optics
- Openable windows
- Power cabling
- Raised floor
- Smoke detectors
- Suspended ceiling
- Telephone Cabling
Piano House office lease offer
| Rent space | Contact us |
|---|
Piano House property info
| Total office space | 4,300 m2 |
|---|---|
| Typical floor space | 1,163 m2 |
| Completion date | 2018 |
These property particulars are only of information character and do not constitute offer to conclude any agreement within the meaning of provisions of Polish Civil Code (Journal of Laws from 1964, no. 16, item 93 as amended).
Piano House location
How to get to Piano House by public transport?
Gdańsk Zaspa railway station is a 10-minute walk from Piano House. 6 tram lines and 6 bus lines stop within a short walk.
Rail:
Gdańsk Zaspa
615 m, 10 min walk
lines S1
every 7.5 min at peak
Tram:
Wojska Polskiego
329 m, 6 min walk
lines 56891112
Zamenhofa
410 m, 7 min walk
lines 56891112
Galeria Bałtycka
613 m, 10 min walk
lines 56891112
Bus:
Reymonta
324 m, 6 min walk
lines 149
Wojska Polskiego
329 m, 6 min walk
lines 158199258262
Chrzanowskiego
474 m, 8 min walk
lines 136149
Source: Rozkłady kolejowe: PKP Polskie Linie Kolejowe S.A. (https://www.plk-sa.pl/klienci-i-kontrahenci/api-otwarte-dane) i Koleje Mazowieckie – KM sp. z o.o.; dane przetworzone; Zarząd Transportu Miejskiego w Gdańsku, http://www.ztm.gda.pl/otwarty_ztm.
Data as of , processed by OfficeList.
Why get in touch with our consultants?




- we make sure the process goes quick and smooth
- we know the market inside out
- we will guide through lease negotiations
- we will schedule all viewings and meetings for you
- fit-out, construction costs and all technical details - yes, we know about that, too
Offices of similar standard
Frequently asked questions about Piano House
How much space does Piano Housecurrently have available for rent?
There are currently no office spaces available for rent in Piano House . Please contact us to find available spaces.
What is the rent rate in Piano House?
The rent in Piano House starts from 13.5 EUR per square meter per month. If you are interested in the offer, please contact us - we will be happy to provide additional information.
What is the service charge at Piano House?
The service charge in Piano House is 17 PLN per square meter per month.
What is the building's office space?
Piano House Total office space is 4300. Typical floor space is 1163 m2.
Which public transport lines stop near Piano House?
Gdańsk Zaspa railway station is a 10-minute walk from Piano House. 6 tram lines and 6 bus lines stop within a short walk.
When was the building completed?
The construction of the Piano House office building has been completed at 2018.
What are the building main features?
The features of the Piano House office building includes Access control, Air conditioning, Carpeting, Computer cabling, Fibre optics.























