Offer advisorPaulina ProtasowBrookfield PartnersOur advisors reply within 1 hour.
Our advisors reply within 1 hour. Mon–Fri 9am–5pm · consultant help is free.
About Green Day office
Certificates: BREEAM Excellent, LEED Platinum.
Completed in 2014, 14,000 m² of office space, typical floor 2,400 m².
Green Day is a modern class A office building located in the center of Wroclaw. It is one of two twin buildings. It has 7 floors above ground and 14,000 sqm of office space. The area of a typical floor is about 2,400 sqm. The office building was built on a U-plan and is distinguished by its generously sized mass. Rhythmic divisions on the facade create a timeless character of the building. Representative architecture and location in the vicinity of the main traffic artery make the building recognizable and perfectly exposed. The office building offers attractive office space in a prestigious location. The high standard of finishes, the use of environmentally friendly solutions confirmed by the LEED Platinum certificate, the possibility of flexible space arrangement, as well as considerable glazing and optimal access to daylight, provide comfortable working conditions. The office building has a restaurant and an underground garage with infrastructure for cyclists. Green Day is located in Downtown, in the vicinity of the University Library, Ostrów Tumski and the Cathedral, the Botanical Garden and the Grunwaldzki Passage. Slightly farther away are the faculties of Wroclaw University, Wroclaw University of Technology, Wroclaw University of Life Sciences and the Medical University. A short walk is enough to reach the islands on the Oder River and extensive green recreational areas, and just 2-3 stops away is the Wroclaw Market Square. Its location in the very center allows you to take full advantage of the city's retail, service, dining, cultural and hotel offerings. The vibrant neighborhood provides inspiration and motivation for action, and is also a place for business and social meetings. The location allows efficient access to other parts of the city, both by public and private transport. Nearby bus and streetcar stops. By car, it takes less than 10 minutes to reach the Wrocław Główny train station, and just over 25 minutes to reach the Wrocław Airport.
Green Day property features
Access control
Air conditioning
BMS
Carpeting
Computer cabling
Fibre optics
Power cabling
Raised floor
Smoke detectors
Suspended ceiling
Telephone Cabling
Green Day property info
Total office space
14,000 m²
Typical floor space
2,400 m²
Completion date
2014
Certificates
Sustainable building
BREEAM · ExcellentSecond-highest level on the five-level BREEAM scale.In-Use International Commercial v6 Part 1: Asset Performance
BREEAM · ExcellentSecond-highest level on the five-level BREEAM scale.In-Use International Commercial v6 Part 2: Building Management
LEED · PlatinumHighest level on the four-level LEED scale.Core and Shell (v2009)
These particulars are for information only and do not constitute an offer within the meaning of Article 66 § 1 of the Polish Civil Code.
Market context
Green Day compared with 9 office buildings in the Śródmieście area. Numbers above the bars are building counts; the blue bar is Green Day.
Asking rent (€/m²)€15.0/m²
113121
7–88–99–1010–1111–1212–1313–1414–1515–1616–17
Śródmieście area median: €13.5/m²·Wrocław median: €14.0/m²
+2Joliot-Curie (Uwr) 6 min · Sienkiewicza / Wyszyńskiego 6 min
6 min walk
Joliot-Curie (Uwr)·341 m·16 docks
6 min walk
Sienkiewicza / Wyszyńskiego·363 m·10 docks
What is around Green Day?
Within an 8-minute walk of Green Day you'll find 32 places for lunch, 4 pharmacies, and 18 parcel lockers. Green space nearby: Arboretum, a 3-minute walk.
Lunch and coffee
32
places for lunch and coffeenearest:Eat2Day · 1 min,Biblioteczka · 3 min,Craft · 3 min
Day-evening-night average (LDEN) outside the building, at its loudest façade. Source: strategic noise map 2022, Urząd Miejski Wrocławia.
Data sources: Wrocławski Rower Miejski, UM Wrocław, OpenStreetMap, Urząd Miejski Wrocławia. Transport as of November 9, 2026, amenities as of November 1, 2026.
Transport: Wrocławski Rower Miejski (Nextbike Polska); Urząd Miejski Wrocławia. Data as of , processed by OfficeList.
How much space does Green Day currently have available for rent?
+−
There are currently no office spaces available for rent in Green Day. Please contact us to find available spaces.
What is the rent rate in Green Day?
+−
The rent in Green Day starts from 15 €/m² per month. If you are interested in the offer, please contact us - we will be happy to provide additional information.
What is the service charge at Green Day?
+−
The service charge in Green Day is 24 PLN/m² per month.
What is the building's office space?
+−
The total office space of Green Day is 14,000 m². Typical floor space is 2,400 m².
Which public transport lines stop near Green Day?
+−
5 tram lines and 16 bus lines stop within a short walk.
Where to eat lunch near Green Day?
+−
There are 32 restaurants and cafés within an 8-minute walk of Green Day. Nearest: Eat2Day (1 min), Biblioteczka (3 min), Craft (3 min).
When was the building completed?
+−
The construction of the Green Day office building has been completed at 2014.
What are the building main features?
+−
The features of the Green Day office building includes Access control, Air conditioning, BMS, Carpeting, Computer cabling.